Getting a lift installed in your building requires proper approvals and documentation. Whether you need lift permission from MCD or a Lift NOC from SDMC, the process involves multiple steps, technical clearances, and compliance with government rules.
1. Regulatory Overview
-
DDA Notification
In denotified areas, DDA no longer provides direct approvals for lift installation. The responsibility now lies with the respective civic bodies like MCD and SDMC. -
Lift permission from MCD
For areas under the Municipal Corporation of Delhi (MCD), residents and societies must apply for lift permission. The NOC is usually valid for 5 years and requires compliance with building safety and planning norms. -
Lift NOC from SDMC
In South Delhi regions, the SDMC issues Lift NOCs. The application process must follow building bye-laws and ensure that light, ventilation, and structural safety are not compromised.
2. Application Requirements
Common Documents:
-
Consent from at least 50% of residents using the staircase (ground floor consent preferred).
-
Structural safety certificate from a licensed engineer or architect.
-
Lift design, drawings, and feasibility report signed by an approved architect.
-
Recommendations from the lift manufacturer regarding technical safety.
-
Affidavits stating no unauthorized construction and agreement to bear maintenance costs.
-
Fire safety, electricity department, and lift inspector clearances (where applicable).
-
NOC from the Residents Welfare Association (RWA) or Cooperative Group Housing Society (CGHS).
-
Indemnity bond to protect civic bodies against liability.
Additional Points for MCD:
-
Processing fees are applicable.
-
Applications are usually processed within 45 days if documents are complete.
Additional Points for SDMC:
-
Lift NOC validity is 5 years.
-
The lift shaft should be self-supported and should not block light or ventilation.
-
Prescribed application forms (such as Annexure-A) must be submitted.
3. Why Professional Assistance Matters
The lift approval process involves multiple departments and strict guidelines. Professional support ensures:
-
End-to-end handling of applications and permissions.
-
Faster approvals through complete and accurate documentation.
-
Compliance with DDA, MCD, and SDMC rules.
-
Safe and reliable lift installation following national standards.
4. Summary
-
MCD handles lift permission in areas under its jurisdiction.
-
SDMC provides Lift NOCs in South Delhi, valid for 5 years.
-
Proper documentation, resident consent, and technical safety clearances are mandatory.
-
Professional guidance helps make the process faster and stress-free.