1. Regulatory Overview

  • DDA Notification
    In denotified areas, DDA no longer provides direct approvals for lift installation. The responsibility now lies with the respective civic bodies like MCD and SDMC.

  • Lift permission from MCD
    For areas under the Municipal Corporation of Delhi (MCD), residents and societies must apply for lift permission. The NOC is usually valid for 5 years and requires compliance with building safety and planning norms.

  • Lift NOC from SDMC
    In South Delhi regions, the SDMC issues Lift NOCs. The application process must follow building bye-laws and ensure that light, ventilation, and structural safety are not compromised.


2. Application Requirements

Common Documents:

  • Consent from at least 50% of residents using the staircase (ground floor consent preferred).

  • Structural safety certificate from a licensed engineer or architect.

  • Lift design, drawings, and feasibility report signed by an approved architect.

  • Recommendations from the lift manufacturer regarding technical safety.

  • Affidavits stating no unauthorized construction and agreement to bear maintenance costs.

  • Fire safety, electricity department, and lift inspector clearances (where applicable).

  • NOC from the Residents Welfare Association (RWA) or Cooperative Group Housing Society (CGHS).

  • Indemnity bond to protect civic bodies against liability.

Additional Points for MCD:

  • Processing fees are applicable.

  • Applications are usually processed within 45 days if documents are complete.

Additional Points for SDMC:

  • Lift NOC validity is 5 years.

  • The lift shaft should be self-supported and should not block light or ventilation.

  • Prescribed application forms (such as Annexure-A) must be submitted.


3. Why Professional Assistance Matters

The lift approval process involves multiple departments and strict guidelines. Professional support ensures:

  • End-to-end handling of applications and permissions.

  • Faster approvals through complete and accurate documentation.

  • Compliance with DDA, MCD, and SDMC rules.

  • Safe and reliable lift installation following national standards.


4. Summary

  • MCD handles lift permission in areas under its jurisdiction.

  • SDMC provides Lift NOCs in South Delhi, valid for 5 years.

  • Proper documentation, resident consent, and technical safety clearances are mandatory.

  • Professional guidance helps make the process faster and stress-free.